After-sales Service: | Meeting Assistance, Personnel on-Side After Sales |
---|---|
Warranty: | 1 Year |
Transport Package: | Container |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Button quick change:
1 employee just needs to push the button then it will quickly change to another shape, change will be completed in 5-8 minutes.
Acceptance criteria
Straightness: 10:1;
Plate type tolerance: ±1mm.
Equipment name: CZ section steel stepless conversion roll forming equipment | Code: SX 80-300 | Semi-automatic changeover | Hydraulically driven | ||||||
1. Machine configuration parameters | |||||||||
Feeding | Guide shaft + guide wheel | ||||||||
Leveling | Upper two lower three + one lead, lead full solid shaft quenching and tempering heat treatment and polishing plating | ||||||||
Main molding | 18 composition type (one of which is waist height forming 87-95 degrees arbitrary roller group) | ||||||||
Equipped with 13 groups of CZ interchange modules, rotate 180 degrees to complete the switching | |||||||||
Linear guide + precision turbine change set | |||||||||
Rib pressing | One word straight | ||||||||
alignment | Ten-roller CZ special two-axis straightening + four-roller two-axis straightening, a total of two straightening units | ||||||||
Leading | With transmission, upper and lower shaft gear drive | ||||||||
Punching | After forming, punch single hole + punch double hole | ||||||||
shear | Stepless shear system after forming | ||||||||
2 | Control system | Main control cabinet | 1 unit | ||||||
Replacement distribution box | 1 (installed in the middle of the rack) | ||||||||
External controller | 1 (can facilitate the control of forward and backward during the production process and commissioning) | ||||||||
The origin of the main parts | PLC, Touch Screen, Relay, Proximity Switch, and Length Encoder can all be custom made | ||||||||
3 | Hydraulic system | Hydraulic motor | Outer five-star piston connecting rod type | ||||||
Hydraulic station | Hydraulic station power 22KW | ||||||||
Fuel tank volume 500 liters | |||||||||
The origin of the main parts | Solenoid valve Beijing Huade or oil research Yuci | ||||||||
4 | Unloader | load | 6 tons | ||||||
Tightening way | The center of the four-link is stretched outward | ||||||||
brake | The spindle is double-hugged | ||||||||
5 | Pallet table | Feed length | 6 meters | ||||||
Feeding method | The frame body is welded with channel steel and angle steel, and the surface is equipped with rollers | ||||||||
6 | Performance parameters | Roll | Material: Cr12 | ||||||
Processing technology: heat treatment to HRC58-60 after CNC machining, fine turning | |||||||||
axis | Material: 40Cr (φ88/φ70). | ||||||||
Processing technology: HRC28-32 after CNC machining and tempering treatment, and then polishing electroplating | |||||||||
weight | The weight of the whole machine is about 11 tons | ||||||||
Second, the production product parameters | |||||||||
1 | Production product specifications |
|
|||||||
2 | Exit speed | High speed 25 m/min, combined speed 10 m/min - 18 m/min (according to the number of holes punched) | |||||||
3 | Material suitable | Q195, Q235 hot-rolled strip or hot-rolled galvanized strip 1-3.0mm | |||||||
3. Accessories and spare parts | |||||||||
Spare parts | One set of punch rods | tool | one set | ||||||
Instructions | One set | other | |||||||
Machine color | ACU color |
THE UNIQUE HUMAN CARE AND PROFESSION PASSIONATE SALES SERVICE SYSTEM
Q1. Production cycle of the machine
A1:Our machine production cycle is determined by the size of the machine customized by the customer. Machines with less than 15 forming wheels are small machines, and the production cycle is about 40-50 days. Within 25 groups are medium-sized machines, and the production cycle is about 50-60 days. More than 30 sets of forming wheels are large machines, and the production week is about 70-80 days. The fully automatic production line may be equipped with hydraulic abrasive punching, CNC punching machines, CNC bending machines welding machines, and other machines, so the production cycle is about 90 days. (The time count starts when the contract takes effect)
Q2. Our payment ratio:
A2:40% advance payment is required before starting the manufacturing machine, and the remaining 60% is required to be paid before shipment after manufacturing is completed.
Q3.Terms of Trade.
A3:We are factory direct sales, so we use FOB (if you need other terms, quote according to the actual situation)
Q4.Warranty period and after-sales service
A4:We provide a one-year warranty period. During the warranty period, if the machine is not artificially damaged (except for wearing parts), we will provide free maintenance services, but visas, air tickets, board, and lodging must be provided by the buyer. After the warranty period, we provide lifetime service for the machine, but buyers need to provide basic labor costs and labor travel expenses, the cost of replacement parts is an extra count. In addition, we also provide remote assistance to solve customer machine problems through video conferencing.
Q5.Machine efficiency
A5:Our machines are customized according to customer requirements, and non-standard automated production lines can meet customer requirements for efficiency.
Q6.Technical support
A6: Customized solutions can be selected according to customer needs, training, and installation as well as technical instructions and operation manuals are provided to customers. ( Is free)
Q7.Device Configuration
A7:machine electrical appliances and roller materials, as well as the automation request and so on, can all be according to customer requirements. To create efficient and intelligent production machines for customers.
Suppliers with verified business licenses